Inquiry (采购产品): 200gpm RO System We are a 23MW biomass plant scheduled to go online late December. We currently have an undersized 25gpm RO system in place. We have studied our needs and have determined a 2-pass 200gpm on the first pass with a 50 to 200 gpm on the second pass system will meet our needs. I would like a quote on a 200/50, 200/100, 200/150, and a 200/200 RO system. In addition I would like a delivery date on such a system. Thanks for your time. Todd Tolkinen Director, Maintenance and Engineering **** Hidden Message ***** Todd Tolkinen 800 West First Ave. Shakopee, MN 55379 USA Company: Koda Energy, LLC Title: Director, Maintenance and Engineering Phone: 952-641-3614 Fax: 952-641-3612 E-mail: ttolkinen@kodaenergy.com **** Hidden Message ***** ttolkinen@kodaenergy.com