Steam turbine generators |
| 02-07 14:25:32 来源: 作者: |
|
Steam turbine generators Inquiry (采购产品): Steam turbine generators Dear Sirs, We are pleased to introduce ourselves as a trading & contracting company which is located in Baghdad-Iraq. One of our clients has an enquiry for supplying two sets steam turbine generators as shown below. I tried to call you but there is a problem in your phone. Please if you have any questions do not hesitate to contact us. Thanks & best regards Bassem M. Al-Najjar Technical Manager Mobile : +00 46 76 251 63 33 Tel. : +00 46 21 481 04 21 V?ster?s - Sweden Bakhert Al-Slama Co. for Trading & Contracting Ltd. Mr. Saleh Farj Authorized Manager Baghdad- Iraq Mobile: +964 790 110 34 79 The required equipments: Boiler 100 ton / h 1- One complete water tube natural circulation D type boiler with bidrums with following specification: - Capacity 100 ton / h - Design pressure 36bar working pressure 31 bars - Super heated steam temp 390 + 10 C? - BFW temp 120 C? - The boiler will work with black oil, fuel oil and natural gas. Black oil specification: - Gravity A.P.I 15.6 Co 8.0 min - Flash point p.m. C o 66 min - Viscosity s.f.s.50 C o 300 max - Pour point C o 26.7 max - Sulphur wt % 4.5 max - Carbon residue 15 max - Water & sediment 2.0 max Fuel Gas specification: - Calorific value (LCU) 11.150 kcal / Nm3 - Pressure at burner inlet 5.000 (mmH2O) 2- The boiler system will include the following Items: - Dual drive FD fans (elect. motor and steam turbine) with forced lubrication system. - Igniters and burner (one burner used gasoline) - Complete starter should be suitable for required fan circuit breaker, Including: vacuum meters (voltmeters & ammeters) Earth fault relay Under voltage relay Motor protection relay Voltage transformers Current Transformers Power Fuse high voltage Control Fuse Auto restart relay in case under voltage less than 4sec. - Complete computerized control system with (PLC) or (DCS) also the vendors must supply the software and programming unit if required. - Supply chemical injection skid with one year chemicals as you're recommended. - Boiler to be supplied with all instrumentation including sight glasses both sides (level indicator) (double level transmitter for steam drum level with recorder) O2, CO2 analyzers flue & fuel gas analyzer also gas density analyzer. - Smoke stacks not less than 35M. 3- Spare parts as following: (boiler spare parts) - Loop with reducer from S.D to W.D (Furnace tube) as built. (Set) - Coil to super heater tube as built - Coil to economizer tube as built - Spare parts for burner consist of (burners, tip of burner, control valve, vent valve, igniters) - Spare part for starter for 2 years power. - 1 set of FD fan bearings - 1 set turbine bearings - 1 set of motor bearings - Complete coupling between motor & FD fan. 4- Training The supplier will cover cost of training for 5 people in the manufacturer country or countries have the same boiler for 2 weeks. 5- - The supplier should supply safety valves, manual valves with standards like (ASME). - The supplier should provide manual for Insulation and explain the method of working. - Supply electrode (welding electrode) for the job remarked with specification according to standard (500kg). - Supply Rolling machine (hydraulic machines) and Expander for tubes in steam drum and Water. Drum and prefer hydraulic type with different type and sizes. - The control system should be DCS or PLC and supply all vendors require. 6- Supplier should complete all civil engineering works (foundation, anchor bolts, sheds, supports, Rooms, platform, stairway) 7- Insulation for whole system (heat exchanger) piping. 8- Origin prefers, Western Europe, Japan and U.S.A. Steam Turbine Generator (2 SET) - Capacity = 5.5 MW - Inlet steam pressure = 20 – 25 bar max - Outlet steam pressure = 4.5 bar - Inlet steam temp = 360 + 10 C? - Complete installation in site with civil engineering works, rooms, shed, stairway, foundation, experimental run, cadre locally training. - Auxiliary lub oil system each turbine. - Output voltage 11 KV 50 HZ - Prefer RPM for electric dynamo = 1000 rpm or 1500 - Synchronizing panel between tow generators and between tow generators and national network, Air circuit breaker 11 KV for each generator. - Inspection certification should be from specialized Authority whole job. - The supplier will cover cost of training for 5 people in the manufacturer country or countries have the same Steam turbine generator for 2 weeks. **** Hidden Message ***** Bassem Al-Najjar SWE Company: Bakhert Al-Slama Co. ,Baghdad-Iraq Phone: +46762516333 E-mail: bassem_al_najjar@yahoo.com **** Hidden Message ***** bassem_al_najjar@yahoo.com |
|
|
|
|
|
|