Inquiry (采购产品): kaplan and francis turbine MIGORI HYDROELECTRIC SCHEME BASIC PROJECT DATA River - Oyani Catchment Area - 98 km2 Type of Generation - Run of River Minimum Flow – 1.0 m3/s Firm Discharge (90%) – 3.5 m3/s Design Flow – 7.5 m3/s Design Flow availability 60% Gross Head - 20m approx. to centre line of runner Nett Head – 19.0m (Francis & Kaplan turbine) Penstock Length - 264m Penstock Diameter - 1.8m to 2.0m Installed Capacity - 1200kW Construction Cost - $3,000,000 Unit Construction C - $2,500/kW Average Annual Energy Capability – 7.779 MWH Firm Annual Energy – 3.812 MWH Y-connection penstock (split unit @ ND1.3m) 1*600KW =1200kw (turbine) pls: advice on the best turbine an specification NB: It is very urgent as the client wishes to hasten the process. **** Hidden Message ***** philip bowa 671 NGONG ROAD KEN Company: otieno odongo & patners Title: eng. Phone: +254770664055 E-mail: bsedah@gmail.com **** Hidden Message ***** bsedah@gmail.com