Demo, erect the no-load block wall. Install steel plate and
02-13 16:59:01 来源: 作者:
Demo, erect the no-load block wall. Install steel plate and
Inquiry (采购产品): Demo, erect the no-load block wall. Install steel plate and anchor it with the new erected wall to protect the wall. I am looking for cost estimate for the following scope of work: 1. Install temporary wall partition to protect processing area 2. Demo the existing structurally damaged no-load block wall 3. Erect new wall 4. Replace existing door including door frame and associated hardware 5. Reuse the existing window 6. Proper disposal of all the materials and debris 7. Clean-up the work area 2. **** Hidden Message ***** Ashok Patel 19116 Company: Kraft Foods E-mail: ashok.patel@kraft.com **** Hidden Message ***** ashok.patel@kraft.com