Inquiry (采购产品): Lehman College For a feasibility study I would need some information: Task: Upgrade Lehman College Compressed Air System. Current System: (22) smaller systems around the campus with aggregate of about 83 HP. Proposed System: Centralized rotary screw air-compressors with VSD (900 scfm @100 psig) How large are the expected savings? Electrical energy savings: Demand savings Dollar Amount: Walter Elyon, PE, CEM, LEEDAP **** Hidden Message ***** Elyon Walter 20 Exchange Place Manhattan, NY 10005 USA Company: AECOM Eergy Phone: 212-991-2125 E-mail: walter.elyon@aecom.com **** Hidden Message ***** walter.elyon@aecom.com