最新跨国采购买家名录 | 最新跨国采购参展商名录 | 世界买家名录名单 | 全球买家资源名录 | 名录集 | 广交会名录名单
您当前的位置:首页 > 国际买家 > 跨国采购买家

02-15 05:13:06  来源:  作者:

thick 35% filters and premium efficient fan motor. Reconnect to existing supply duct to Tenant “B” area served. Provide 100% outside air economizer sequence. Locate new thermostat in Tenant “B” area. Demolish and remove existing air cooled condensing units connected to air handlers that were demolished. S-5), Trane Torrivent, H&V ,15 HP serves warehouse area Tenant “A” F&I 2 new Trane model TTA090, nominal 7.5 ton air cooled condensing units in the place where existing condensers were located. Evacuate existing refrigerant piping and provide new refrigerant. F&I new Trane MCC-6 air handler to replace HVAC #8,2,800 CFM ,heating and ventilating only,2 HP, with two-way control valve. Reconnect to existing HW piping. Clean outside air intake duct and louvers. Provide new 2” thick 35% filters, variable speed motor drive and premium efficient fan motor. Reconnect to existing supply duct to locker room “Tenant “B” mezzanine area. Provide 100% outside air ventilation sequence. Locate new thermostat in area served. Service, check and test 3 existing exhaust fans along the east side of the building. The other 3 exhaust fans to be demolished by others. Service, check and test the HW propeller unit’s heaters. (UH-1) to remain in the warehouse area. Reconnect the UH to the new hot water piping. Service, check and test Boiler Room combustion make up air damper and controls. F&I new DDC building energy management control system to control both existing to remain equipment and new equipment. System to be Johnson Controls, Siemens, Automated Logic or Alerton. Provide duct mounted smoke detectors at all new AHU’S Please indicate if the following is included in your bid package, Return to Anthony Gryak Company: Submitted BY: YES NO Base Building Mechanical Systems Page 4 of 5 F&I new exhaust fans for the toilet, locker rooms and ADA bathroom, in the quantity of 12 air changes per hour. F&I premium efficient motors for all new motor applications 1HP and larger. New motors to be operated by VFD’S shall have inverter duty motors. Confirm that the warehouse area roof relief hoods operate correctly. Insulate new HW piping with 2” thick fiberglass insulation with ASJ. Insulate new condensate drain piping with 1: thick fiberglass insulation with ASJ. Insulate new and ETR refrigerate suction and hot gas bypass piping with 1” thick Armaflex. Insulate new supply duct with 1-1/2” thick, 3/4 LB. fiberglass with FSK jacket. Test and Balance the new systems to design capacity +/- 10% Coordinate duct smoke detectors and power feeds to new equipment with Electrical Contractor. Provide container for all demolished MEP equipment, and removal and disposal in accordance with State, Federal and Local regulations Provide power lifts Provide approximate lead time with bid on new equipment Furnish shop drawings for approval Provide new piping and duct layout for Engineer’s approval Furnish test and balance report Furnish as built drawings Submit all equipment cuts for engineer’s approval Provide 1 year warranty service on all labor and material Furnish MEP equipment manufacturers letter of warranty Furnish O&M manuals for all new AHU equipment, including, valves , motors, VAV boxes , condensers and controls ALTERNATE Provide two new Patterson-Kelly Mach C-1500 condensing boilers instead of the above specified SD-1700-2 boilers with the same accessories. Provide Heat-Timer controls system to stage boiler operation and reset the discharge water temperature based on the outside air temperature. Continued next page Please indicate if the following is included in your bid package, Return to Anthony Gryak Company: Submitted BY: YES NO Base Building Mechanical Systems Page 5 of 5 ALTERNATE Provide three new Patterson-Kelly Mach C-1500 condensing boilers instead of the new SD-2000-2 boilers with the same accessories specified above. Provide Heat-Timer controls system to stage boiler operation and reset the discharge water temperature based on the outside air temperature MA State Tax MA State Tax Bond, if required ,for out of state contractors End of Mechanical Leveling Sheet Winstanley Construction Management Subcontractor Leveling Sheet 4-13-09 Valor One- 77 Champion Drive, Chicopee, MA WCM 77-770 Please indicate if the following is included in your bid package, Return to Anthony Gryak Company: Submitted BY: YES NO Plumbing Package Make safe domestic hot and cold water lines Loop existing heating water supply and return Separate Tenant A from Tenant B heating supply Remove existing men’s room toilet for ADA requirements-TBD Install existing men’s room toilet for ADA requirements-TBD Make safe all vent and drainage lines Reroute footprint fire hydrant supply line Provide trench drain at loading dock Connect loading dock trench drain to main sewer line Add re used stainless steel sink with hot & cold water -TBD MA State Tax MA State Tax Bond , if required, for out of State contractors Add-Alternate Reroute domestic H&C water to Battery Room for eye wash Provide hose cock in loading dock area-domestic cold water Responsibility Plan (raci) Responsible Accountable Consult Inform Valor One Adam Tom John Anthony Robert Breck Ed Activity WE77 WCM WCM WCM AHA L&W DWT&C Site Work I I A R C C C DEMO I I A R C C C MEP I I A R C C C HVAC I I A R C C X FF&E I I A R C C X FINISHES I I A R X C X Contracts I A R C C C C Risk Management Plan R=Risk L-Low M-Medium H-High Risk Impact Impact Impact R Task WE 77 Tenant A Tenant B Demo of Mezzanine Damage to Building Envelope None Environmental Noise, Dust M Demo of Store Rooms Damage to Building Envelope None Environmental Noise, Dust M Demo of MEP Temporary loss of building systems None Loss of operating capacity H Demo FACP Loss of fire protection notification None Loss of Life Safety System H Excavate Loading Dock Structural damage to building envelope None Environmental Noise, Dust, Gas Line, Fire Protection supply H Relocate fire protection line Loss of base building fire protection None Loss of fire protection H Separate electrical service Temporary loss of building electrical service None Loss of operating capacity. No Domestic Hot Water? H Separate heating service Temporary loss of building heating supply line None No Heat L Demo HVAC No heating /Cooling No H/C No Heat/Cooling H Demo Boilers No Heating No Heat No Heat L Perform ACBM in Corridor No Impact No Impact No access to rear corridor exit to office space or restrooms. L **** Hidden Message ***** Anthony Gryak 300 George Street New Haven, CT 06511 USA Company: Winstanley Ent. Title: Project Manager Phone: 203-645-8397 E-mail: agryak@winent.com **** Hidden Message ***** agryak@winent.com
来顶一下
返回首页
返回首页
发表评论 共有条评论
用户名: 密码:
验证码: 匿名发表
推荐资讯
中国买家求购涤棉俯绸坯布
中国买家求购涤棉俯绸
中国买家求购涤棉纱卡
中国买家求购涤棉纱卡
中国买家求购全棉纱卡、帆布等
中国买家求购全棉纱卡
赞助
    无相关信息
栏目更新
栏目热门