最新跨国采购买家名录 | 最新跨国采购参展商名录 | 世界买家名录名单 | 全球买家资源名录 | 名录集 | 广交会名录名单
您当前的位置:首页 > 国际买家 > 广交会买家

STRUCTURAL ENGINEERING CONSULTANT OPPORTUNITY

01-09 18:45:02  来源:  作者:

STRUCTURAL ENGINEERING CONSULTANT OPPORTUNITY

This is an inquiry message about STRUCTURAL ENGINEERING CONSULTANT OPPORTUNITY in the 108th China Canton Fair. (这是一条买家关于'STRUCTURAL ENGINEERING CONSULTANT OPPORTUNITY'的询盘信息,来自第108届中国广交会。)Inquiry Message (询盘信息) STRUCTURAL ENGINEERING CONSULTANT OPPORTUNITY DEAR SIR: HAPPY NEW YEAR TO YOU.. DO YOU NEED A STRUCTURAL ENGINEERING CONSULTANT? I CAN STRAIGHT OUT YOUR ARCHITECTURAL, CIVIL, STRUCTURAL, FIELD TROUBLE SHOOTING PROBLEM. TURN AROUND FAST EVEN FAST TRACK PROJECT, FEE REASONABLE WITH MY DESIGNING BUILDING ALL TYPE FOR 28 YEARS EXPERIENCES. I DESIGNED A COMPLETE 250 FEET LONG CONVERYOR SYSTEM AND I DESIGNED A CONVERYOR IN EXISTING COGEN PLANT FOR PURDUE UNIVERSITY, INDIANA. THANK YOU FOR YOUR CONSIDERATION IF I CAN MEET UP WITH YOU. ENCLOSED, PLEASE FIND MY RESUME. REGARDS; EDWARD C. LIN;S.E. EDWARD C. LIN, S.E. 5512 SOUTH KIMBARK AVENUE, CHICAGO, ILLINOIS, 60637 Telephone: 001-1-773-288-5467; Fax: 001-1-773-633-2236 EMAIL:edwardclin2@aol.com OBJECTIVE PURSUE A STRUCTURAL ENGINEERING POSITION EXPERIENCE 2011-PRESENT; SUPERIOR ENGINEERING; LEAD STRUCTURAL ENGINEER ARCELORMITTAL; INDIANA PLANTS; UTILITY RELOCATION -1400’ PIPE BRIDGES, 150’-0” HIGH ELECTRIC POWER TOWER, FOUNDATION DESIGN FOR 150’- STACK AND TANKS; RENOVATED EXISTING FOR SUBLANCE; 250’-0” CONVEYOR SYSTEM; UNDERGROUND VAULT INSIDE EXISTING BUILDING FOR ABBOTT LAB; FOUNDATION DESIGN FOR ELECTRIC TRANSMISSION TOWER AND MANY SUBSTATIONS FOR ABB; BP AMOCO REFINERY PLANT, INDIANA; DESIGN PIPE RACKS, PIPE BRIDGE, PLATFORMS, CHIMNEY STACK FOUNDATION, GENERATOR FOUNDATION; PER B.P DESIGN CRITERIA BETHLEHEM STEEL, MIDWEST PLANT, INDIANA; DESIGN AND CONSTRUCTION, COST ESTIMATE FOR UPGRADED EXISTING GALVANIZED LINE FROM 3 UP TO 4 TIERS INCLUDING CUTTING 150’-0” ROOF TRUSS AND RESUPPORT ROOF SYSTEM 2004 EPSTEIN INTERNATIONAL; PROJECT MANAGING STRUCTURAL ENGINEER DESIGN (3) STEEL AND MASONRY BUILDINGS IN SEISMIC ZONE 3, ALBERTSON STORAGE FACILITY, CA 1991-2003 EDWARD C. LIN & ASSOCIATES, INC; STRUCTURAL& ENGINEERING CONSULTANTS; COMPLETE ENGINEERING SERVICES -- ARCHITECTURE, STRUCTURE, MEP, CIVIL TO ARCHITECTS, DEVELOPERS, CONTRACTORS, CLIENTS INCLUDING AT&T, MORTON INTERNATIONAL, EAST LAKE MANAGEMENT; SERVICES INCLUDING BUT, NOT LIMIT TO: DESIGN AND ANALYSIS, DRAWINGS PREPARATION, COORDINATE WITH ALL DISCIPLINES, FIELD OBSERVATION, TROUBLE SHOOTING, HIRING ALL OTHER CONSULTANTS, TO MEET DEADLINE ON SCHEDULE IN THE BUDGET; PROJECTS AS FOLLOWS: DESIGNED AND BUILT PRE-ENGINEERING GYMNASIUM AND SCHOOL; 10-STORY MASONRY SHEAR WALL AND FLEXICORE CONDO; 40 STORY CONCRETE SHEAR WALL AND FRAME IN BANGKOK; THAILAND; SHOPPING CENTERS, HIGH END HOUSES INCLUDING DOME ROOF TIMBER HOUSE ON STILT WITH 150 MPH WIND; REINFORCED EXISTING 150’-0” ROOF TRUSSES FOR RUN TRACK TO BE HUNG FROM ROOF, VIBRATION OF ADDITIONAL FLOOR FOR BASKET BALL COURT; DESIGN (3) STORY PHARMACEUTICAL PLANT EXTENSION FOR ABOTT LAB. DESIGN SHEET PILE SHORING SYSTEM NEXT TO 4 STORY BUILDING; SEAWALL BY LAKE MICHIGAN SHORE LINE, DAM DESIGN, WATERSPILL WAY, WASTE WATER TANK ( UNDER ARMY CORP INSTRUCTION); BUILDING ALL TYPES GRAND CONSTRUCTION & DEVELOPMENT INC; GENERAL CONTRACTOR; COST ESTIMATE, BID AND CONTRACT PREPARATION, SCHEDULE WORK, CONSTRUCTION SEQUENCE, COORDINATION ALL DISCIPLINES, COMPLETE JOB ON TIME, COLLECTION; 6 FLAT REHAB BY DEPARTMENT CONO HOUSING OF CHICAGO; BUILDING GYMNASIUM AND SCHOOL FOR MOODY ACADEMY FIRE STATION RENOVATION BY VILLAGE OF WESTERN SPRING 1989-1991 KOLBJORN SAETHER & ASSOCIATES; CHICAGO, IL DESIGN 6-STORY HOSPITAL AND PEDESTRIAN BRIDGE, TWO WAY POSTENSION FLAT PLATE SLAB DESIGN FOR 40 STORY HIGH-RISE BUILDING POSTENSION SLAB AND GIRDER DESIGN OF 8 STORY PARK GARAGE, 8 STORY CONCRETE COMPOSITE STEEL FOR HOSPITAL INCLUDING UNDERGROUND TUNNEL LINK AND STEEL DOME ROOF FOR CAFETERIA 1986-1988 AND 1981-1982 SKIDMORE & OWINGS & MERRILL, CHICAGO, IL 18 STORY HIGH-RISE BUILDING COMPLEXES OVER RAILROAD TRACK, ENGLAND; LONDON STOCK EXCHANGE AT LIVERPOOL STATION CHICAGO ELEVATED TRAIN STATION INCLUDING RAILROAD BRIDGE 11 STORY HIGH-RISE CONCRETE FRAME OFFICE BUILDING 40 STORY HIGH-RISE CONCRETE SHEAR WALL AND FLAT PLATE FLOOR BUILDING DESIGN 2-LANE 3 SPANS 300’ LONG TEMPORARY BRIDGE IN LIVERPOOL STATION 1982-1985 SARGENT & LUNDY, CHICAGO, IL DESIGN STRUCTURAL COMPONENTS FOR NUCLEAR POWER PLANT MODIFICATION STEEL ELEMENT PER NRC REQUIREMENT FOR CLINTON PLANT DESIGN 5 STORY TRUSS FRAME OFFICE BUILDING WITH 150’ WIDE BY 300’ LONG HOUSING GENERATOR FOUNDATION, G.E MAINTENANCE FACILITY, LONDON, BRITAIN SKILL PROJECT MANAGEMENT; TELEMARKETING, ENGINEERING SALE LICENSES 1991 STRUCTURAL ENGINEER OF ILLINOIS (S.E.) 1990 PROFESSIONAL ENGINEER OF ILLINOIS (P.E) (INACTIVE) EDUCATION 1981 UNIVERSITY OF TEXAS AT ARLINGTON, TX; MASTER OF SCIENCE AND ENGINEERING COMPUTERS RAM, RISA, SAP, STAAD, ENERCALCS, PCA-MAT, MANY DESIGN SOFTWARES; ETABS (user friendly version of SAP), SAFE (finite element version of pc-mat) CODES INTERNATIONAL BUILDING CODE, ASCE-7, UBC, ACI, AISC, BRITISH BUILDING CODE, AASHTO REFERENCES RON LUPINSKI -- PROJECT MANAGER ---001-1-219-395-8972 (O) CRAIG WATT ---- PROJECT MANAGER ---001-1-219-838-2930 (O) SCOTT HAMILTON ----VICE PRESIDENT--001-1-219-844-7030 (O) MARTY BRZYCKI ---SQUAD LEADER --- 001-1-219-844-7030 (O) Contact Info (联系信息) EDWARD LIN 5512 SOUTH KIMBARK CHICAGO, IL 60637 USA Company: EDWARD C. LIN & ASSOCIATES, INC Title: structural consultant Phone: 117732885467 E-mail: edwardclin2@aol.com edwardclin2@aol.com mingluji.com2011-2012Contact Us(联系我们) Mobile | Computer
来顶一下
返回首页
返回首页
发表评论 共有条评论
用户名: 密码:
验证码: 匿名发表
推荐资讯
中国买家求购涤棉俯绸坯布
中国买家求购涤棉俯绸
中国买家求购涤棉纱卡
中国买家求购涤棉纱卡
中国买家求购全棉纱卡、帆布等
中国买家求购全棉纱卡
赞助
    无相关信息
栏目更新
栏目热门