We are able to supply Thai Iron Ore Fe 63% on FOB and CFR basis: Fe Content: 63%, Reject 61% Silica (SiO2): 3.5% Maximum Alumina (Al2O3): 3.5% Maximum Phosphorus: 0.09% Maximum Sulfur: 0.09% Maximum Titania (TiO2): 0.5% Maximum Size (10-50mm): 90% Minimum Moisture: 8% Maximum Loading Port: Koh Sri Chang Port, Thailand Lead time: 45 days after receipt of L/C for 1st month, 30 days subsequently Inspection: CCIC Thailand or SGS Thailand Performance Bond: 2% FOB Price: US$78/MT CFR Price: US$105/MT Email: josephhkng@yahoo.com I want to receive: