最新广交会买家名录 | 最新广交会参展商名录 | 124届广交会名录 | 2018广交会名录 | 125届广交会 | 2019广交会名录
您当前的位置:首页 > 国际买家 > 世界买家

Free Standing Stairs

03-06 08:05:18  来源:  作者:

Free Standing Stairs

Inquiry (采购产品): Free Standing Stairs Hello, I am looking for free standing stairs for the interior of our storage facilities that we build. I have added our Detailed Scope of Work: Provide all labor, tools, materials, equipment, permits and insurance to complete fabrication, prime and install of all structural steel stairs, landings and rails, etc. as required for a complete job, to include, but not be limited to: A. Two (2) sets of free-standing stairs and landings between the first, second and third floors. Stairwell walls are sheetrock and light guage framing only. B. Stairs to be constructed per prints, notes, discussions, and field measurements. C. All 1?”rails, rail extensions, and rail extensions shall return tight to walls or into itself. D. Provide intermediate steel members, ?” solid square stock vertical pickets, so that a 4” sphere cannot pass thru the railings. E. Stair stringers and landing frames shall be MC12x12.7 (or allowable MC12 x 10.6) F. Stairs and landings shall fill the 19’-4”x 9’-4” stairwell shafts G. Stringers and landings shall be tight to adjacent walls. H. Min 11” treads, 3/16” 7 ga check plate, per code requirements. I. All risers, in a run, shall be the same height, per code requirements. J. Landings shall be 3/16” 7 ga check plate attached firmly with no bubbles. K. Landings shall be a minimum of 4’-8”wide. Wider landings at exit doors. L. All steelwork, materials, welds and connections, shall be completed in a good and workmanlike manner, primed and ready for paint. M. Project is to be kept clean and orderly at all times. M. Compliance with all applicable ADA, OSHA and local safety regulations is included. N. An English speaking, on-site, foreman is required, at all times. O. Contractor will maintain sufficient materials and manpower as required for the timely and diligent progress to project completion. P. Intent of this scope of work, and prior discussions, is that there be no change orders. This contract is for a complete project, inspected and certified. Q. All work shall pass all required local, state and federal inspections. Can you help? **** Hidden Message ***** Debra Bente 17 Scenic Loop Boerne, TX 78006 USA Company: SBS Construction Title: Sales E-mail: dbente@superiormetal.net **** Hidden Message ***** dbente@superiormetal.net
来顶一下
返回首页
返回首页
发表评论 共有条评论
用户名: 密码:
验证码: 匿名发表
推荐资讯
中国买家求购涤棉俯绸坯布
中国买家求购涤棉俯绸
中国买家求购涤棉纱卡
中国买家求购涤棉纱卡
中国买家求购全棉纱卡、帆布等
中国买家求购全棉纱卡
赞助
    无相关信息
栏目更新
栏目热门