Requirement for Turbo blower for our blast furnace
03-06 08:12:07 来源: 作者:
Requirement for Turbo blower for our blast furnace
Inquiry (采购产品): Requirement for Turbo blower for our blast furnace In are in the process of setting up a blast furnace 630 m3 capacity in India. So for that we need the following items: 1.Blower type: Stator blade adjustable axial flow blower, with min. hub diameter of 50 cm Inlet air quantity: 2250 m3/min Inlet pressure: 0.09804 MPa Inlet temperature: 29.7 ° Outlet pressure: 0.35MPa Outlet temperature: 180°C Quality of Steam for Turbine Steam Pressure: 66 ata Steam Temp. : 490°C 2.Top pressure Recovery Turbine:main design parameter BF 630m3 Gas flow 12.4~13.6X104Nm3/ pressure 0.12MPa(max 0.15MPa) Temp. 100-160℃ Dust % ≤10mg/m3 external pressure 10-20kPa **** Hidden Message ***** Samanway Das 110066 Company: Monnet Ispat & Energy Ltd E-mail: s.das@monnetgroup.com **** Hidden Message ***** s.das@monnetgroup.com