Inquiry (采购产品): Assistance with new HPU Have a client who is installing a new HPU which is being integrated with existing system. As a part of this change the system working fluid is being changed from HCWF (98/2) to Mobil DTE 20. Can you provide on site assistance with cleaning of existing system components and preparation of new system for start up? **** Hidden Message ***** Robert Pincelli 44144 Company: Middough Consulting E-mail: pincelrg@middough.com **** Hidden Message ***** pincelrg@middough.com