Inquiry (采购产品): Power Generation Cooling in Dubai A customer in Dubai, UAE wants to generate power for a 28kW rack, and provide 16 degC to 20 degC air (at a 1600 cfm rate) to the intake of the rack (on the bottom of the rack at the raised floor height) for 2 to 3 months, how long would it take to get both a generator and a cooling unit (preferably not chilled water because of installation time) to this customer in Dubai? (System rack runs on 3-phase power with 50 Hz, 380-415 VAC, and uses a 5125P6W plug.) It is really need to be operational no later than the end of April.....I just found out about this request, hence the short runway! My office number is below, but today (and probably Monday as well), I'll be working remote and can be reached at 715-353-2916 **** Hidden Message ***** Norb Poch 3605 N. Hwy 52 Dept GFQ, Bldg 050-2 Rochester, MN 55901 USA Company: IBM Title: Adv Engr Phone: 507-253-3089 E-mail: norbpoch@us.ibm.com **** Hidden Message ***** norbpoch@us.ibm.com