最新广交会买家名录 | 最新广交会参展商名录 | 124届广交会名录 | 2018广交会名录 | 125届广交会 | 2019广交会名录
您当前的位置:首页 > 国际买家 > 世界买家

REQUEST FOR QOUTATION

03-10 08:52:45  来源:  作者:

REQUEST FOR QOUTATION

Inquiry (采购产品): REQUEST FOR QOUTATION Dear Sir, We are dealing with import of industrial goods for various users in Pakistan. Can you please send us a quotation for sheet metal bending machine with desired parameters stated below. Yours truly, Athar M Qureshi Director Import Division M. R SIMAN & CO Lahore, Pakistan -------------------------------------------------------- Sheet Metal Bending Machine Company Quoting OEM Model Origin Total Cost Machine Parameters Requirements Quotation of Vendor Number of Axis 5-Axis ( Proposed Axis+Y1,Y2,X,R,V) Pressing Force 2200 KN Working Length 4270 mm Distance between side plates 3820 mm Opening Height 485 mm Depth of throat 400 mm Side travel 250 mm Width of working table (Customized) 300 mm Common used dies for working table R2,R3,R4,R5,R6 Position Tolerances Position tolerances (the front & back positioning) + 0.1 mm - Size of up & down (for R-axis) + 0.1mm - Left & right positioning + 0.1 mm - Working table deflection compensation (for V-axis) + 0.1 mm - System Performance of Machine Machine should be adopted with NC system when performing the machining and at the same this machine has the function of read and edit the documents of the “CATIA” format. Speeds of Machine Approachable Speed 100 mm/s Working Speed 21 mm/s Return Speed 200 mm/s Working Environment Motor Power 37 KW Machine Installation Power 50 KW Power Supply 380 V+10 %. 3 Phase, 50 Hz+ 1 % - - Power Stabilizer Provided with Machine Ambient Temperature 5 – 30o C Working Noise of Machine Compliance With International Standards Controller Powerful Pentium based PC control with following configurations: Automatic Programming Software 12 – 15 Inch TFT Display Alphanumeric Keyboard with soft Keys Disc Drive ( 1.44 MB ) Ethernet DNC Connection USB for Keyboard Pointing Device Microsoft Windows NT/2000 Hard Disc ( 60 GB ) CD ROM Drive ( Read/ Write ) Pentium 1V Processor RAM ( 512 MB ) Air Conditioner In Electrical Cabinet Publications 03 Copies of following Technical Manuals in English (Free of Cost ): Operation Manual Maintenance Manual Equipment Manual Spare Parts Manual Programming Manual CNC Programming Hand Book Part Assembling Drawings, Electric, Pneumatic & Hydraulic Principal Diagrams PLC Programming Manual , Soft & Hard Copies Alarm Information File/Manual on Soft Copies Alarm Solution File/Manual on Soft Copies Spare Support Certificate for availability of spares for at least 10Years Tool Kit List of Standard Tool Kit for daily use and list of tooling required on machine. Spare Parts ( Optional ) Separate lists of Consumables, Spare Parts for 02 Years ( Free of Cost ) for the following Systems: Mechanical System Electrical/Electronic System Hydraulic System Training Training in English at OEM workshop free of cost ( Including from/to Pakistan, boarding & lodging) in following areas: 6-7 Weeks for 4-5 Persons Operation and Programming on Machine 2-3 Persons Maintenance of Machine (Electrical/Electronic) 1 Person Mechanical/Hydraulic Systems (For Scheduled, Unscheduled Maintenance,Calibration,Inspection etc ) 1 Person Training In English at Installation Site in Pakistan 4 weeks of operational training on actual machine after installation and commissioning Acceptance Criteria Warranty Standard Warranty to be provided after commissioning of machine on site Performance Bond To fill bond certificate for warranty period of 10% of machine cost Testing ( 1 ) Machine should be brand new according to the international standards (2) Supplier will produce one part of specifications to be provided by the user after commissioning of the machine. The product part will be checked for accuracy and precision as part of the testing Installation and Commissioning The entire responsibility of installation and commissioning of the machine on site will be borne by the seller who shall provide service engineers for commissioning at customer’s site for the required duration. The seller should provide civil works details required for machine installation within four weeks of signing of the contract. The buyer will reserve the right to delay the installation of machine due to unforeseen reasons by 8-10 months without affecting the installation/commissioning responsibility of the seller and the operational warranty of the machine that starts after installation/commissioning of the machine. Note The information about the offered machine against tender inquiry is to be filled in by the vendor and provided both on hard and soft copies. **** Hidden Message ***** Athar Qureshi 407 -Q, DHA Lahore54792 PAK Company: M. R Siman & Co Title: Director Import Divison E-mail: amq9@hotmail.com **** Hidden Message ***** amq9@hotmail.com
来顶一下
返回首页
返回首页
发表评论 共有条评论
用户名: 密码:
验证码: 匿名发表
推荐资讯
中国买家求购涤棉俯绸坯布
中国买家求购涤棉俯绸
中国买家求购涤棉纱卡
中国买家求购涤棉纱卡
中国买家求购全棉纱卡、帆布等
中国买家求购全棉纱卡
赞助
    无相关信息
栏目更新
栏目热门