Inquiry (采购产品): Request for Budget Quote Hello, I am a project engineer for an Owner/Operator of combined cycle cogeneration power plants. One of our facilities in California has an air cooled condenser that in hot weather has trouble condensing the full steam turbine exhaust flow. I would like to receive a price, delivery, size, and surface area budget estimate for an atmospheric dump condenser at for the following conditions: Steam Flow: 12,000 LB/Hr Steam Pressure: 10 - 15 PSIG Steam Temp: 240 F Cooling Water Flow: 76,000 LB/HR Boiler Make-up water Cooling Water Temp: 120 -135 F Cooling Water Pressure: 60 PSIG Carbon steel shell and Admralty brass tubes should be ok. Thank you, Kevin Fullerton, P.E. Project Engineer Delta Power Company, LLC 2142 Westminster Ave. Costa Mesa, CA 92627 (949) 548-3229 office (949) 548-3213 fax kfullerton@deltapower.com www.deltapower.com **** Hidden Message ***** Kevin Fullerton 2142 Westminster Ave. Costa Mesa, CA 92627 USA Company: Delta Power Company, LLC Phone: 949-548-3229 E-mail: kfullerton@deltapower.com **** Hidden Message ***** kfullerton@deltapower.com