Inquiry (采购产品): Air cooler/condenser I need a budget-quality quote (plus or minus 15% FOB Cranberry PA) for a project at Cranberry Township, PA wastewater treatment plant. He are the key parameters: Case A: 3,800 CFM on the air side Cooling with plant effluent water Inlet air temp: 105 F at 90% RH Outlet air temp: 85 F at 100% RH (this unit condenses about 1 GPM) Log mean temp difference water-to-air: 20 F Cooling rate: approx 430,00 BTU/HR Desired airside static pressure loss: less than 1 inch W.C. Water use: approximately 100 GPM Materials: 304 stainless or comparable on condensing air side surfaces. This is an odor control system with minor amount of sulfur-based acids. Case B: 10,000 CFM on the air side Cooling with plant effluent water Inlet air temp: 96 F at 90% RH Outlet air temp: 80 F at 100% RH (this unit condenses about 0.75 GPM) Log mean temp difference water-to-air: 20 F Cooling rate: approx 670,00 BTU/HR Desired airside static pressure loss: less than 1 inch W.C. Water use: approximately 140 GPM Materials: 304 stainless or comparable on condensing air side surfaces Can you help us with an estimate on this? - Allen Potter **** Hidden Message ***** Allen Potter 15668 USA Company: AEP Services Title: President Phone: 724-325-1510 E-mail: potterae@adelphia.net **** Hidden Message ***** potterae@adelphia.net