Inquiry (采购产品): Steam Boilers Retubing Tools We are Hilton Hurghada Long Beach Resort. We are looking for tools required for retubing our steam boiler. Our boiler is Kewanee, 150 hp, catalog No : H3s-150-0 Order No : 897921 The tube sheet thickness is 2.65 mm minimum and 2.8 mm maximum The fire tubes are beaded. We have only 45 cm to access the back of tubes. The number of tubes are 96 This is the first time we retube this boiler. However, repairing has been done twice by expanding the original tubes.Fire tube inner diameter is 48 mm. **** Hidden Message ***** Ibrahim Saad Hurghada, Egypt, Sahl Hashish Hurghada31111 EGY Company: Hilton Title: Chief Engineer Phone: 065 3461500 / 0106001932 Fax: 065 3461509 E-mail: ibrahimsaad@hilton.com **** Hidden Message ***** ibrahimsaad@hilton.com